Chapter 13 of 16

Apps and reports

Plain text PDF Source

On this page
  1. What comes first
  2. Who uses our apps
  3. Start from the job
  4. Design it as a clickable mockup first
  5. The working surface
  6. The app palette
  7. Compact layout and type
  8. Density
  9. Status colours
  10. Visual charts
  11. Planning and scheduling screens
  12. The past is a record; missed work comes back
  13. Navigation and scope
  14. Entering and changing data
  15. Dashboards and figures
  16. Tables people work in
  17. Words and numbers
  18. Freshness, speed and poor signal
  19. AI drafts
  20. Brand where it helps
  21. The shared app system
  22. Interaction and reporting states
  23. Visual example: stock coverage
  24. Stock and shortage reports
  25. Print and export
  26. Before publishing

Use this chapter for the apps our own people use every day: production and delivery trackers, factory and warehouse screens, site apps, procurement and stock reports, dashboards, financial summaries and analytical tools. Chapters 01 to 12 were written for marketing. This chapter is the standard for internal apps: they must be easy to use on the factory floor and on a phone, show the numbers that matter, use charts where a picture is quicker than a table, and look like ours wherever that does not make them harder to use.

This chapter applies only to internal apps, operational reports and internal research reports, including exports for our own people. There it replaces the colours, shapes and sizes of chapters 03, 04, 05 and 07. Promotional websites, product pages, campaigns, email signatures, proposals, quotations and sales decks retain their marketing rules. A report format does not turn promotional material into an operational tool.

Internal apps have their own look, called Ink: near-white pages, dark text, a dark primary button, small corners and compact rows. Its colours, corners, sizes and icons are in this chapter and replace the website's inside internal apps and the reports this chapter covers. The official logo, Satoshi and the brand voice stay the same everywhere. An app already in use keeps the look it has now until the whole app is moved to Ink in one go. Until then, keep its colours, buttons, corners, sizes, icons and menu as they are: follow the rules file inside that app, or match its other screens if it has none. Nothing in this chapter about those, including the checklist, applies to it before it moves. Everything else here does.

A new operational report or internal research report uses Ink, whether our own people open it in a browser, export it or receive it by email. A report made for the reports portal, new or existing, uses the portal's present look until the portal moves: follow the portal's own layout rules for colours, shapes and sizes. A report already in use outside the portal keeps its present look until the whole report is moved. A report sent to a customer is customer material and follows the marketing chapters, as do all other emails and documents.

What comes first

When two rules pull in different directions, decide in this order:

  1. Usable. The person can do their job on the device they have, first time, without help and without mistakes.
  2. Informative. The screen answers their question: what is done, what is left, what is late and what to do next.
  3. Visual. A chart, bar or colour shows the answer faster than reading numbers, with the exact numbers beside it.
  4. On brand. Logo, Satoshi, colours, shapes and voice as below.

A brand rule never wins over a usability need. If one has to give way, keep the usability fix and note the conflict for the next revision of this chapter.

Who uses our apps

Design for the least technical person who does the job, in the place they do it.

Who Where and how What that means for the app
Factory supervisors and production staff On the floor, on a phone, often standing, with dusty or gloved hands, in noise and bright light Big tap targets, a few large numbers, one job per screen, entry with the number pad, nothing that depends on hover
Production and planning managers At a desk on a laptop, several times a day Dense tables and charts, filters, bulk actions, export to Excel
Delivery and warehouse team Between the yard, the loading bay and the office Today's trucks and what is ready, large enough to read at arm's length
Site managers On site, on a phone, on a weak signal Short forms, photos from the camera, works when the signal drops
Directors On a phone or laptop, briefly What needs attention, at the top, with the reason

English is a second language for many of our people. Use short plain words, the terms the factory already uses, and numbers rather than sentences wherever a number will do.

Start from the job

  • Write down each person's daily jobs before designing a screen, for example "record what was built today" or "see what is ready to load". Each job gets a clear way in from the menu or the home screen.
  • One main job per screen, with one primary button. Secondary actions are outline or quiet buttons, or text links.
  • The home screen answers "what needs me today": late items, today's plan, what is waiting for my decision.
  • Put the answer before the detail: the total, the status and the reason at the top; the full table below it.
  • Every number that a person might act on links to the records behind it.

Design it as a clickable mockup first

Most of what makes a screen usable comes from changing a clickable mockup with the people who will use it, not from a written specification. For a new app, a new screen or a redesign:

  • Build the mockup before the real screen. One page, every interaction working, nothing saved. Use fictional data in realistic volume: hundreds of rows, long names, the busiest project. Five tidy rows hide every density problem.
  • Put every state in the demo data, where it shows on opening. Done, part done, at risk, missed, empty, a day off. A feature that cannot be seen in the demo cannot be judged.
  • Let people change it on the spot. The user comments on the part they mean ("No need for the SO here", "Default should be 10 days"). Make each round small, publish it to the same link, and answer each comment with what changed.
  • Check every round on a phone and a laptop, in light and dark, before anyone else sees it.
  • Keep a list of what is settled: names, defaults, grouping, what was removed. Later rounds do not undo it without asking.
  • Number the versions. The real screen is built from one approved version, with a list of the changes since the last one, so building and further design can run side by side.
  • Remove what does not earn its place. When someone asks "Is this really useful?", the figure or panel goes unless someone can name the decision it changes.

The working surface

  • Use the page colour behind everything and White for cards and tables. Use the quiet panel colour for table heads and grouped panels, and the selected colour for the chosen row. Keep the page light.
  • Start with a compact header: the menu bar, the page title, the selected scope, the data timestamp and the most useful filter or action. Do not add a decorative hero or lifestyle photograph.
  • The menu bar of a Huxberry app is Warm Leaf, with a one-pixel rule under it. It carries the Forest Ink H mark (logo/huxberry-h-forest-ink.svg), 24 px tall or more, with the app's name beside it as ordinary text. Keep clear space the width of the H stem all round the mark, and never set the name to look like part of the logo. In dark the bar is a quiet dark leaf grey and the mark is White (logo/huxberry-h-white.svg). The two are one link home, read out as "Mattress costing, home".
  • The full Huxberry wordmark stays on the sign-in page and on anything printed or sent to a customer.
  • SPT apps keep the plain bar, in the colour of cards, with the SPT logo (chapter 15), never Huxberry's.
  • Design for the phone first for any job done away from a desk, then widen for the laptop. On phones keep the primary action in reach of the thumb, at the bottom of the form or in a sticky bar.
  • Put the decision near the top: what is available, what is needed, what needs attention. Keep the comparison visible together.
  • Prefer a clear matrix or a small number of related panels over a long stack of oversized cards. Comparable subjects can use a matrix on desktop and stack in a logical reading order on phones.
  • The primary button is dark, not green. Brand green means focus, the current page and links; status green means done. One primary button per screen; the rest are outline, quiet or text.
  • Buttons, inputs, tabs and badges have corners of 6 px or less, and cards and dialogs about 8 px. There are no pills in menus, buttons, tabs, filters or badges. Switches, radio marks, avatars and progress bars stay round.
  • Pages are flat. Only menus, pickers and dialogs that open over the page carry the soft shadow they come with. No decorative gradients or ornamental panels.

The app palette

Every colour has a light and a dark value. Apps are light by default.

Role Light Dark Use
Page #F6F8F8 #0F1412 Behind everything
Cards and main surface #FFFFFF #161C19 Cards, tables, the plain bar of an SPT app
Menus and panels that open over the page #FFFFFF #1C2320 Dropdowns, pickers, help tips
Text #161D1A #EDF1EF Headings, body text and figures
Muted text #5C6762 #98A39E Secondary text, table heads, "Not confirmed"
Primary button #1B2420 #E9EEEB The main action on a screen
Primary button text #FFFFFF #161D1A On the primary button
Secondary button #EFF2F1 #232B27 Quieter actions
Quiet panels #EFF2F1 #1F2723 Table heads, grouped panels
Hover #E9EDEC #26302B Under the pointer
Borders and rules #DFE4E2 #2A332F Card edges, dividers, table lines
Field borders #7F8B86 #6F7C76 Edges of input boxes and pickers
Brand green #2C5A45 #7CC29E Focus, the current page, links
Selected row #E6EFEA #1E3128 The row or item picked
Information #2A5DA8 #8AB6F2 Counts and neutral notices
Ground behind information #E8F0FB #182A42 Behind an information badge or notice
Menu bar #E4EADA #262E24 The bar at the top of a Huxberry app
Menu bar muted text #4A554F #B4BEB6 Secondary and hint text on the bar
Menu bar hover #D2DCC1 #384235 Under the pointer, an open menu's name, shortcut keys and the rule under the bar
Menu bar field borders #707C6C #8B9787 The edge of a typing field on the bar

The menu bar colours are for that bar alone. Text, the underline, focus and counts on it are the page's, and a search box on it is the colour of cards. Whatever opens from it, such as a dropdown or the search, keeps the page's colours, and so does the bar at the bottom of a phone. A status on the bar sits on its own pale ground.

Nobody adds a colour inside an app. Text reaches 4.5:1 on its ground. Field borders, focus rings and essential chart marks reach 3:1. Information blue is not a fifth status: it never says whether something is good or bad.

Compact layout and type

Reduce padding before reducing type. Default to compact; a comfortable mode is optional for tables used over long periods. Do not force a report to fit one screen by making its contents unreadable.

Element App and report setting
Content width Up to 1440 px; wider only for a table that benefits from it
Outer gutters 24 to 32 px desktop; 16 to 20 px phone
Section spacing 16 to 24 px; 8 to 16 px between related panels
Panel padding 12 to 16 px
Page title Medium, 15 to 18 px, usually on one row with the toolbar
Section heading Medium, 14 to 16 px
Card heading Medium, 14 to 16 px
Explanatory body copy Regular, 14 to 16 px; line height 1.4 to 1.6
Table data 13 px on a laptop, 12 to 14 px elsewhere; line height 1.3 to 1.5
Table heads and chart labels 12 to 14 px
Secondary captions and source notes 12 px in compact mode; never use this for the main result or an action
Primary result or shortage 18 to 24 px; numeric emphasis may be Bold
Buttons and fields (laptop) 32 px tall; 28 px inside a table row
Table rows and heads (laptop) Rows 28 px, heads 30 px; long content may make a row taller
Touch targets (touch screens) At least 44 px in both directions, including controls inside rows. A laptop used with a mouse keeps the laptop sizes above
Gap between tap targets At least 8 px, so a gloved thumb does not hit the neighbour
Text in input boxes 16 px on touch screens (smaller text makes phones zoom the page when the box is tapped)
Corners 6 px on buttons and inputs, 4 to 6 px on tabs and badges, about 8 px on cards and dialogs
Icons Phosphor Icons, Regular weight
Key figure on a phone or shared screen 24 to 40 px, Medium or Bold, readable at arm's length

The smaller table and caption sizes are a scoped exception to chapter 04's marketing minimum of 14 px. Preserve browser zoom and text resizing. At 200% zoom, keep labels and controls usable; wide data tables may scroll within their own labelled region. Use tabular numerals, right-align quantities, and keep units beside values or in an explicit unit column. Table sizes are for screens; print follows Print and export below.

On phones, stack panels, show essential results first and contain wide tables in a horizontal scroll region. Keep the whole page from scrolling sideways. Provide a visible scroll cue. Important totals must also be readable in a summary outside a wide table.

Density

A working screen shows its data at once. People should not scroll to reach what they came for.

Screen What must be in view
List, on a laptop At 1440 × 900 the first data row starts within 170 px of the top, and a full list of one-line rows shows at least 20
One record, on a laptop At 1440 × 900 the main table, the result and the status show without scrolling. Where an app keeps some figures closed until asked, such as prices, show what the record is and its status
Any screen, on a phone At 390 px the first data row or the decision is on the first screen, and the page never scrolls sideways
  • A screen carries one heading row and one toolbar row above its data. The two may share a row.
  • Put explanations in a help tip, not in a paragraph or subheading above the data.
  • Filters people rarely use go behind one "More filters" control.
  • Measure these on the real screen with a full day's data, not by eye.

Status colours

Status is information, not decoration. Use the same meaning in badges, charts and tables. These colours are permitted only for apps and reports. In this chapter, status green, red, amber and grey mean the four colours below.

Status Light: colour on its ground Dark: colour on its ground Meaning
Available / covered (green) #18724A on #E5F3EB #62C592 on #163024 Done, on track, confirmed usable supply or confirmed coverage
Shortage / issue (red) #B3372A on #FBEAE7; hatched in bars #F08E82 on #3A1D19; hatched in bars Late, blocked, a calculated shortage or an actionable issue; label assumed demand "Estimated"
At risk (amber) #8A5200 on #FBF0DC #E2AD55 on #33270F Will be late or short unless someone acts soon, for example a forecast past the deadline but not yet overdue
Not confirmed (grey) #5C6762 on #EFF2F1 #98A39E on #1F2723 Not started, or evidence is missing, stale or incomplete; never a fabricated zero

The same four states cover progress in production, delivery and planning apps: green for done, confirmed or on track; amber for at risk; red for late, short or blocked; grey for not started, not confirmed or no data.

Use the status colour as text, icon or mark on its own ground, on a card or on the page. All four reach 4.5:1 there, and on quiet panels and selected rows. In light screens a small filled badge may use White text; in dark screens it takes dark text. The word, with an icon where useful and a number, carries the meaning; the ground is only context. A status badge is never a button: it has no pointer cursor, hover treatment or button-sized action area.

Status red is an operational colour. Do not use it for logos, decorative headings, marketing buttons or product tags. A zero in the available-now column is neutral; the calculated shortage column carries the red. Never colour a financial figure by its sign alone: red marks a labelled actionable issue such as "Over budget AED 4,200".

Use red sparingly: the shortage value, one concise issue badge, or the missing segment of a bar. Do not fill a whole report or row with saturated red. For emphasis in an order column use the red's own pale ground, a card or a quiet panel with a red rule and red text. Keep status green for verified availability, not a forecast, incoming purchase order or an unchecked assumption.

To use the published CSS status variables, add the hux-report class to the report root. They hold the light colours and are scoped to that class, not to marketing pages: --hux-report-available, --hux-report-issue, --hux-report-at-risk and --hux-report-not-confirmed. The grounds and the dark colours are in tokens/huxberry-tokens.json.

Every status includes a word and a quantity where relevant: "Available 480 m", "Shortage 120 m", "Awaiting size confirmation". The shortage segment of a coverage bar is always hatched and labelled. Colour alone is never the only way to distinguish the states. Text contrast must reach 4.5:1; essential chart marks and focus indicators need 3:1 against adjacent surfaces. Check the actual rendered pair, including print and greyscale.

Visual charts

Choose the smallest chart that answers the question, and keep an exact table alongside it.

Question Recommended visual
How much demand can stock cover? Horizontal bar: green covered segment and red missing segment, with required quantity and exact labels
Which site or customer uses the material? Horizontal bars by site or customer, followed by a consolidated table
What can we produce? Covered units and shortage units with a labelled coverage bar; an optional simple line icon may help identify the product
When is supply arriving? Receipt schedule or timeline, separate from stock available now
Is the position improving? Time-series line chart with dates, units and a clearly marked target
How far along is each item or project? A progress bar per row (done of total), with the numbers beside it
Are we building to plan? Bars per day or week for actual, with the plan as a line or outline bar, today marked
Will it finish in time? A timeline (Gantt) with today, the deadline and the forecast finish; anything past the deadline in red with the reason
Is the factory over capacity? Bars of planned work per week against a capacity line, for one station or route in its own unit; weeks over the line labelled with how much. Never a total across unlike work
Where is the work waiting? A horizontal bar per stage (to build, built not sent, sent not installed)

Put a chart at the top of a page whenever it answers the page's main question faster than the table does. A small chart on every row (a bar or a sparkline) often helps more than one large chart.

On phones, tapping a bar or point shows its value; hover does not exist on a touch screen.

For adjacent green and red segments, add a visible separator in the card colour and retain exact labels; the two are almost the same lightness, so their hues alone do not tell them apart.

Start quantitative bar axes at zero. Use consistent scales when comparing the same measure. A demand bar is capped at the required quantity; show surplus stock separately. Do not use 3D charts, dual axes or decorative pies for simple comparisons. Green, red, amber and grey encode status, not site or customer identity.

Categories, such as sites, customers or product types, may use the four chart colours below, never status colours.

Chart colour Light Dark
Chart 1 (blue) #1654A9 #3B82E6
Chart 2 (plum) #A23D7B #AC4287
Chart 3 (teal) #1D94B7 #15A0B6
Chart 4 (violet) #6040A1 #8858C8
  • The order is fixed: start at Chart 1 and do not skip or swap. The set passes colour-blind checks only for neighbours in this order.
  • For that reason every series has a direct label, beside the mark where it fits. A legend alone is not enough.
  • Draw the marks on the page or a card, not on quiet panels, hover or selected grounds, where some are too faint.
  • A series keeps its colour when a filter hides the others.
  • With one category, or more than four, use Chart 1 for all of them and tell them apart by position and direct labels. Small ones may be grouped as "Other".
  • A chart in customer material uses the marketing colours, told apart by position and direct labels, never these chart or status colours.

Provide a text equivalent or accessible data table for every chart. Hover details may add information but cannot be the only place to find a value. Keep legends explicit: "Covered from available stock" and "Shortage now"; show still to order as a separate figure. In monochrome, keep the shortage segment hatched and both segments labelled. Respect reduced-motion preferences.

Planning and scheduling screens

Plans for production, delivery and installation are worked on all day by a planner at a desk and read on the floor. These patterns made the factory's production plan usable:

  • Slim rows. One line per item: its number, what it is and the quantity. Long descriptions are off by default behind a "Show descriptions" switch. When they are off, the list narrows and gives the room back to the chart.
  • Never repeat what a heading or filter already says. Group rows (project, then product type) under bands that fold with an arrow on the left, and drop the project from each row. Group headings lead with the reference people search by: "SO-10234 – Example Contracting · Tower A".
  • Filters at the top, beside the page title. Use tick lists that allow several choices, with Select all, Select none and an "only" link on each line, a count beside each, and a button that says what is picked ("3 projects"). A picked project keeps its heading even with nothing in it yet, and says what to do: "Nothing planned yet · 13 to plan: drag one onto a day".
  • A short window that opens on today. For example 10 days, with From and To dates and quick spans. Show working days only. A day off keeps its column, hatched, and nothing can be planned on it.
  • Drag first, type as a fallback. Drag an item from the to-plan list onto a day. Drag a bar to move it, and its ends to change its dates. Double-click opens the exact dates and quantity in a small box beside the pointer, for when the end is off the screen. Enter saves and Esc closes. Ticked items move together.
  • Show where it landed. After anything is planned or moved, or picked from a list of warnings: open its group, scroll to it and ring it for about three seconds.
  • Plan part of a quantity. An order released in full may be built in batches. Planning takes the whole quantity by default; the quantity can be lowered, and the rest stays in the to-plan list. Show planned of total: "24/40".
  • Warnings count and lead. A small button beside the chart title counts each kind of problem ("3 to replan", "2 after production date"). Clicking it shows them.
  • A divider between the list and the chart that can be dragged to widen the list; double-click puts it back. On phones the two stack.
  • Keep the layout still. A strip for the selected item's details is always there, with a hint when nothing is picked, so a click never pushes the chart down and a double-click never lands on another row. Redraw on a window resize only when the width changes, so a phone toolbar sliding in does not jump the view.
  • Capacity only for like work. Do not add work that goes through different routes or teams into one load figure: it looks precise and means nothing. Show a capacity line only for one station or route, in its own unit.

The past is a record; missed work comes back

This applies to any plan: production, delivery, installation, purchasing.

  • Days before today show what happened, as the system of record says (builds, delivery notes), not what was planned. They cannot be edited. A batch running over today keeps its start; only its end and quantity change, never below what is already done.
  • Nothing undone stays on an old date, and nothing disappears. Each morning, after the records are read, whatever was planned on a past day and not done leaves the plan.
  • It waits at the top of the to-do list, in a red section that cannot be folded ("Replan first: 3 work orders not built on their days"), oldest first. On the chart it is a dashed red outline on its old days ("16 not built"). Clicking it in the list shows where it was planned.
  • Part done is split. What was done stays on its days as a record ("✓ 5 · 7 not built"); only the rest comes back.
  • Replanning starts from the missed quantity, so the person does not have to work it out.
  • Block the outputs people work from, never the facts. A printed day plan waits until missed work is replanned, so the floor never works from a plan that leaves it out. Recording what happened (a delivery, a build) is never blocked by a mismatch with another system: the mismatch is flagged for someone to fix.
  • The main menu is plain text, in the menu bar. Keep it to about seven items, named for the job ("Production plan", "Deliveries"), and group related pages under a dropdown.
  • Mark the current page with a brand green underline, and in the page code so that screen readers say it too. A page inside a dropdown marks its group.
  • Settings and Sign out sit under the person's name.
  • On phones the menu must not push the content below the first screen. A bar at the bottom holds the main jobs in reach of the thumb, with the rest under "More".
  • An app with many records has one search over its pages and records, opened by ⌘K, Ctrl+K or a search icon. It shows only what the signed-in person may open.
  • The address holds the view: the project, filters and tab are in the URL, so a shared link or a refresh opens the same view.
  • A filter chosen on one page never silently narrows another. If a choice carries over, show it at the top ("Showing Pier8 only · Show all").
  • The selected scope (project, dates, filters) is always visible on screen, in screenshots and in exports.

Entering and changing data

Saving must never surprise anyone. A person must always know whether what they typed is saved.

  • One way to save per screen. A form with several fields has a Save button. A grid where each cell saves on its own is allowed only when every cell shows its state.
  • Four visible states. Not saved yet (an amber mark on the box), saving, saved (a green tick shown only after the server has confirmed) and not saved because of an error (red, with the reason and the typed value kept so it can be fixed).
  • Leaving a box does not save by surprise. Saving happens on Save or Enter. If an app does save when the person leaves a box, the box says so and shows the four states.
  • Check on the server and explain in plain words, with the limit: "Only 34 of 40 are left to deliver", not "Invalid quantity". Checks in the page are for speed only.
  • Numbers and dates. Number boxes open the number pad. Dates default to today and refuse the future where the thing cannot have happened yet. Quantities cannot go below zero or past what was ordered.
  • Corrections are their own action. "Correct the total" is a separate, labelled control. Do not ask people to type a negative number to undo a mistake.
  • Removing. Say what will happen ("Its 11 units stop counting as delivered. It stays in the history."), ask once, and keep the record. Offer Undo for a few seconds after moves and removals.
  • Bulk changes show how many records will change before they are applied, and save all or none.
  • Undo is refused when someone else has changed the record since, with a message saying so, rather than overwriting their change.
  • Every change is logged with who and when, and the history is one tap away from the record.
  • Never lose typed work. Warn before leaving a page with unsaved changes, and keep a draft if the signal drops.

Dashboards and figures

A dashboard answers "how are we doing and what needs attention" in the first screen. These rules came from redesigning the Joinery Profitability report in November 2026.

Order. One row of headline figures (five at most). Under it, two panels side by side: the period view and "Needs attention". Then the main chart beside its ranking (for example value by month beside the largest orders). Detail tables come last, each the full width. On a phone the same order stacks.

Say each fact once. Do not repeat a figure in a tile, a card and a sentence. Do not write a fixed verdict ("profitability is strong") into a template: it stays the same when the numbers change. State the figures and let people judge.

Short figures. In tiles, charts and one-line summaries, show three significant figures with K for thousand and M for million:

Exact Shown
845 845
12,345 12.3K
265,769.83 266K
5,449,780.61 5.45M
11,727,717.24 11.73M

The exact figure is one hover or tap away, and tables keep whole figures (rates keep their decimals). Say once near the top: "K = thousand, M = million. Point at a figure for the exact amount." A figure never wraps and never spills out of its box at 375, 768, 1024 or 1440 px wide.

Headline tiles. Two lines: the label, then the figure with its context beside it ("6.18M 52.7% margin"). The context drops below the figure only when the tile is too narrow. An issue tile, such as unmatched builds, goes last, in red.

Name what a number is. Use the measure's real name: "value built" is not "billed revenue", and order value is not value built. When a chart's title could mislead, add one line under it saying how the figure is measured and from what.

Periods are a table. Yesterday, this week, this month and this year are rows; revenue, cost, profit, margin and count are columns. A period with no activity says "No builds", not a row of zeros.

Share bars show the whole. In a ranking, a bar's track is the total, so each bar is that item's real share; never scale bars to the largest item. Show the figure, what it is out of, and its share: "3.15M of 6.78M · 26.8%". Say in the panel heading what the top items add up to: "Top 8 are 86.3% of 11.73M".

Monthly bars are to scale against the largest month, with the short total and the margin at the end of each row. The full monthly table sits behind a "Monthly table" toggle.

Panel headings are one line in sentence case, with any qualifier small on the same line. No small capital label above them.

Breakdowns go in the table. Product, installation, order value and share are table columns on one line per row, not a second line of text under each item in a chart panel.

Tables people work in

  • Keep the header row and the first column (the item name) in view while scrolling.
  • One line per row. A value repeated on every row, such as the product type, becomes a group heading row instead of a grey second line under each item.
  • Text too long for its column, such as a note or a reference, stays on one line and is cut with an ellipsis. Only text that is actually cut gets a dotted underline and opens in full by tap, click or keyboard, with who and when underneath where that helps. A cut link stays a link, with an ⓘ beside it for the full text. Give such a column a minimum width, so a phone still shows enough to recognise the row. Nothing depends on hover: never a pop-up that only a mouse can reach.
  • Right-align quantities with tabular numerals. Show a totals row where totals mean something.
  • Hide finished rows by default when the job is about what is left, with a visible count and a switch: "Show completed lines (61 hidden)".
  • Sort the most urgent rows first by default (late, then at risk), and say how the table is sorted.
  • Short column headings are fine on wide tables when a visible key under the table explains them, because hover text cannot be read on a touch screen or reached by keyboard.
  • A row that needs attention gets a red or amber rule at the left edge and the reason in words ("Ends after the production date, 7 Nov"). Do not fill whole rows with red.
  • Long lists get a search box. A table wider than the phone scrolls inside its own labelled region, never the whole page.
  • Offer Excel or CSV export with the same columns, scope and timestamp as the screen.

Words and numbers

  • Plain English, sentence case, British spelling, no em dashes, no exclamation marks.
  • Use the factory's own words for things, and explain trade abbreviations (WO, OWO, W/H) in a key or on first use.
  • Every number has its unit and what it counts: "12 units built today", not "12".
  • Missing or unknown values show "Not known" or "Not confirmed", never 0 and never a blank.
  • Dates as "7 Nov" in tables, with the year only when it is not this year. Times in Dubai time.
  • Every status carries its reason: "Late: ends 9 Nov, production date 7 Nov".
  • A summary or status box gives one answer first, in green when all is well ("All good: nothing to do") or red when not ("4 to fix"), then a few bullets with the numbers and what to do. No paragraphs, and nothing the tab name already says.

Freshness, speed and poor signal

  • Every page with figures read from another system shows a Last Refreshed box at the top right of its header: "Last Refreshed NetSuite" and the time of the read itself, in Dubai time ("✓ Fri, 20 Nov 2026, 04:02"). On time it is green with ✓; late (past the expected read plus a grace) it turns red with ✕ and says "Not refreshed on time"; a failed read says "Did not refresh" and keeps the last good figures. Never a blank or a zero: "Not read yet".
  • Hovering or tapping the box opens a panel: what was last read from that system, what each read covers and how often it runs.
  • Refresh now sits at the foot of that panel, not beside the box, so it takes a deliberate hover or tap and the header stays clean. While it runs it says "Refreshing…" and the panel stays open. It is refused, with the reason in plain words, within 15 minutes of the last read or while one is already waiting. Where a read is heavy on the source system, only administrators see the button.
  • Say which figures are typed into the app and which come from another system, so people know where to correct them.
  • A page should be usable within two seconds on a 4G phone. Show what is loading instead of an empty page.
  • When the signal drops, say so, keep the last data visible and read-only, and never accept an edit silently that cannot be saved.

AI drafts

Some apps write text for people to check, such as outreach emails, summaries and briefs. Anyone using the app must be able to tell AI-written text from text a person wrote or approved.

  • Label it until a person approves it. AI-written text carries the label "AI draft" wherever it is shown.
  • Show what it was based on. A "Based on" list names each record, document or page used and where it came from ("Hotel brief, from the CRM"). A source with an address is a link that opens the record, with a 44 px touch target; long names use Cut text. When there are none, it says "No sources" rather than showing nothing.
  • Figures follow the usual rules. A figure the AI could not find says "Not confirmed", never 0, and a figure it estimated is labelled "Estimated".
  • Nothing goes out before a named person approves it. Nothing AI-written is sent, published or handed on as final until then. It may wait in another system only as a clearly marked, unapproved draft for the person who will approve it there. Approve a batch at once only when the approval names each item in it.
  • Say who approved it and when. After approval the label changes to "Approved by Nish, 10 Nov".
  • Show edits and keep the original. When a person edits a draft, the label says "AI draft, edited by Nish", then "Approved with edits by Nish, 10 Nov". The original draft is kept and stays one tap away behind "Show original".
  • Send back or reject, with the reason. People can send a draft back or reject it as well as approve it. The label shows who, when and why: "Sent back by Nish, 10 Nov: wrong hotel name".
  • Green only once approved. Only approved text uses status green. Every other state uses the grey "Not confirmed" tone, never red or amber: a draft is neither a shortage nor late.
  • Use the shared parts. Start from the shared AI draft label and Based on list, so drafts look and work the same in every app.

Brand where it helps

  • Satoshi with the system font as fallback, the app palette, the official logo and the brand voice. The website's button and panel shapes, its coloured bands and its icon weight stay on the website.
  • Keep apps light by default. A dark theme is allowed for screens used in low light. It uses the dark column of each colour table, and every colour and status pair is checked again on the rendered screen.
  • Build each app on the published tokens (tokens/huxberry-tokens.json, where the app palette sits under apps-and-reports, and the .hux-report status variables), so a brand change reaches every app.
  • Start from the shared app system below, so a control looks and works the same in every app. If the set has nothing for the job, build it from the same tokens.
  • Line icons, Phosphor Regular weight, may label actions and item types, in the text or muted text colour. Photographs are for records (site photos, product photos), not decoration.

The shared app system

Every internal app starts from the same set of parts. Nobody builds a button, a status badge or a table from scratch, and nobody picks colours. A control then looks and works the same in every app, and someone who has learned one app already knows the next.

Part What it is Why it helps
Theme The Ink colours in light and dark, with type, corners and sizes, generated from the tokens A brand change starts in one place and reaches each app as a reviewed update
Standard controls The full set of ready-made controls, such as button, input, select, checkbox, dialog, tabs, card, badge, table, menu, search and chart. Apps use them exactly as they come, never edited Improvements arrive with no work to redo. The theme alone gives them the Huxberry look
Huxberry parts The twelve parts marked below, built from the standard controls. One exists only where no standard control does the job The rules here come built in, so nobody has to remember them
Rules file One short page kept inside each app. People and AI agents follow it on every screen change The same instructions everywhere, including what to do when a part is missing
Design check A small script run before finishing a change Reports an edited standard control, a control built by hand, a colour from outside the theme, retired colours and fonts, and an out-of-date theme
Version without React The same theme and sizes as plain CSS, for apps not built in React, with Cut text as one small script and the AI draft label and Based on list as CSS only, with no script Apps on other technology look and work the same, with no rebuild

Which part for which job

The job Use What it already does
Name the page and say how fresh it is Page header (Huxberry) Title, scope, time, source, and a warning once the data is too old
Say when the figures were read Last Refreshed box (Huxberry) On time, late or failed, with the reads and Refresh now in its panel, and the reason when a refresh is refused
Show a status Status badge (Huxberry) Word, quantity and reason in a status colour, never colour alone
Show a figure Value (Huxberry) The number with its unit, or "Not confirmed" when it is unknown
Work through rows Data table (Huxberry) Fixed header and first column, stated sort, group rows, totals and a phone layout
Narrow a list Filter picker (Huxberry) A tick list with Select all, Select none and counts, on a button that states the pick
Explain a term Help tip (Huxberry) Opens by tap, click or keyboard, so nothing depends on hover
Show long text in a row Cut text (Huxberry) One line per row. Once the text is cut, the rest opens by tap, click or keyboard; a cut link gets an ⓘ. Apps not built in React have the same part as a small script
Show a save Save state (Huxberry) Not saved, saving, saved and error. It says saved only once the server confirms
Show a lost signal Connection notice (Huxberry) Says the signal has dropped and nothing can be saved until it is back
Mark AI-written text AI draft label (Huxberry) "AI draft" until a named person approves it, then who approved it and when; edits, send-backs and rejections say who, when and why, with the original behind "Show original"
Show what AI text was based on Based on list (Huxberry) Each source and where it came from, linked to the record where it has an address, or "No sources"
Give the answer first Standard alert You give it one answer, in status green or red, then a few short points
Show a failure Standard alert You give it a short title, what happened in plain words, and what to do
Show nothing to see Standard empty panel You say what is empty, why, and what to do
Show a wait Standard skeleton or spinner You shape it like what is coming, and say what is loading
Anything else: buttons, fields, menus, dialogs, tabs, charts Standard control Sizes, focus, keyboard and touch are already right

Building a screen

  1. Look through the shared set first, standard controls before Huxberry parts. A part may exist under another name.
  2. Needed by one app only: build it in that app from standard controls, shared parts and the theme.
  3. Useful to other apps: add it to the shared set, then take it into the app.
  4. Never type a colour, and never edit a standard control or restyle a shared part for a different look. If a Huxberry part is wrong for everyone, fix it in the shared set, so that every app gets the fix.
  5. Run the design check before finishing and fix what it reports. If something has to stay, record it as an exception with the reason. Keep that list short, because each entry gets reviewed.

An app's own hard rules still win inside that app.

Updates

Each app holds its own copy of the shared parts, taken at a numbered version. Updating the brand never changes a running app, and building or deploying an app never depends on the brand files. Someone reviews what would change, takes the update, and checks the screens.

An app stays wholly on the look of the version it holds until its own move. Never mix two looks in one app: the theme, controls, corners, icons and status colours move together.

The set of parts is private and is never published on this site. The setup and update steps are in site/README.md in the brand repository.

Interaction and reporting states

Filters must update the chart, table, headline figures and assumptions together. Keep the selected scope visible in screenshots and exports. Use proper table headers, visible keyboard focus and meaningful button names. Explain loading, empty, stale and error states in plain language. Never show a green success state before a save or refresh has actually completed.

Visual example: stock coverage

This example uses fictional material quantities. Green shows the usable stock credited to demand; hatched red shows the shortage now.

Illustrative stock position. Fictional SKUs and quantities, no incoming receipts.

FAB-101: 600 m required

Covered from stock: 480 m · Shortage now: 120 m

Shortage now: 120 m. Still to order: 120 m.

Material / useUnitAvailable nowRequiredShortage nowIncomingStill to order
FAB-101 · 140 cm
Panel and border
m4806001200120
FAB-205
Upholstery
m3603000 · Covered00

Scroll the table sideways for every quantity.

FAB-205 has 60 m surplus. It cannot cover FAB-101's shortage. If 100 m of FAB-101 is already on a confirmed receipt due before the need date and allocated to this demand, shortage now stays 120 m, but still to order falls to 20 m.

Stock and shortage reports

The default summary has one row per material or mechanism:

Material / item ID · unit · available now · use by site or customer · total required · shortage now · incoming quantity / ETA · still to order.

  • Shortage now = max(0, required − usable available), per material ID and unit.
  • Incoming is separately shown: confirmed, usable receipts allocated to this demand and due before its need date. Uncertain or late receipts remain visible but do not reduce the order requirement. Incoming is neutral, never green, and a shared receipt is counted once.
  • Still to order = max(0, shortage now − qualifying incoming). If incoming covers the gap, show "0 · On order" in neutral text; this is not stock available now.
  • If available or required is missing, show "Not confirmed" and do not calculate a shortage. If required is estimated, label the result "Estimated": an estimated shortage stays red, but estimated coverage is neutral. Green "Covered" needs confirmed supply and demand. If a need date or receipt eligibility is unconfirmed, label still-to-order as provisional rather than treating all incoming as usable.
  • Define the selected locations, stock statuses and commitment treatment. Available stock should already be net of commitments; do not subtract them twice.
  • Separate unusable, damaged, quarantined and unapproved stock. Keep incoming receipts separate from stock available now.
  • Count a shared stock pool once across sites or customers. State the allocation order or priority. Within the same unrestricted stock pool, per-site shortages must sum to the consolidated shortage and allocated stock must not exceed the usable pool. Where transfer restrictions prevent pooling, calculate separate pools and state the restriction; an allocation of zero to one site does not mean the physical stock is zero.
  • Combine uses of the same approved fabric SKU, such as panel and border. Do not add different fabric types into a "total fabric" row or offset one material's surplus against another's shortage.
  • State yields, units, scrap allowances, approved replacements and finished-stock credits where they affect the result. Do not quietly substitute widths, grades or mechanisms.
  • A production-capacity estimate must identify its limiting materials and unverified inputs. Alternative priorities drawing on the same stock are not quantities to add together.
  • Distinguish confirmed figures from assumptions. Missing data displays "Not confirmed", never a fabricated zero. Show the stock refresh time and the source.

Use White paper, the official logo, Satoshi with Arial fallback and the same status meaning. Aim for a one-page overview when the content supports it. Hide the menu bar, controls and repeated detail, not material rows, units, selected scope or assumptions that change the decision. Keep the detailed schedule separately if needed.

A daily work sheet for the floor is A4 portrait on White, grouped like the screen, with a tick box on each line, the day's whole units (any remainder on the last days, never "13.3"), the batch, what is built so far, a notes column, supervisor and checked-by lines, and the scope and time printed. Open it from the day's heading on the plan.

Use table text 9 pt or larger, captions 8 pt or larger and legal/source details never below 7.5 pt, following chapter 08. Do not scale an oversized screen down until it becomes illegible. Status marks must survive printing without background graphics: prefer SVG, or set print-color-adjust and provide dark-text and outline fallbacks. Check the actual PDF page count, clipping, font loading and greyscale distinction. Exports retain the data timestamp, scope and whether figures are confirmed or assumed.

Before publishing

  • A clickable mockup with realistic fictional data, showing every state, was agreed with the people who will use it before building.
  • Someone who does the job tried each daily job on a phone, without help, and finished it.
  • Rows are one line; nothing repeats what a heading or filter already says; details the job does not need are off by default.
  • After every change the item is shown where it landed, and the change can be undone.
  • Days before today are read-only and show what happened; nothing planned and not done is left on an old date or lost.
  • Every save shows not saved, saving, saved and error; nothing saves by surprise; mistakes are refused with the limit in plain words.
  • On touch screens, tap targets are 44 px or more with 8 px gaps and input text is 16 px; nothing depends on hover.
  • At 1440 × 900 a list starts its data within 170 px of the top and a record shows its result without scrolling; at 390 px the first data row or the decision is on the first screen.
  • One heading row and one toolbar row sit above the data; explanations are in help tips.
  • No pills in menus, buttons, tabs, filters or badges; corners follow the table.
  • The main question of each page is answered at the top, with a chart where a chart is quicker.
  • The Last Refreshed box names the source system and the read time; Refresh now is in its panel; missing values say "Not confirmed".
  • Tiles and charts use short figures (5.45M) with the exact figure on hover or tap and whole figures in tables; nothing spills or wraps at 375, 768, 1024 and 1440 px.
  • Each fact appears once; every measure is named for what it is (value built, billed revenue, order value).
  • AI-written text is labelled, shows its sources, and nothing is sent or handed on before a named person approves it.
  • The menu bar is right: Warm Leaf with the Forest Ink H mark and the app's name in a Huxberry app, plain with the SPT logo in an SPT app. The full wordmark is on the sign-in page and on print.
  • Satoshi, the app palette and the dark primary button are correct; brand green is kept for focus, the current page and links, and status green for done.
  • Screens use the standard controls unedited and the shared parts, and the design check reports nothing new.
  • Density keeps comparisons together and numbers legible on desktop, phone and at 200% zoom.
  • Red means a calculated shortage or actionable issue, labelled "Estimated" where an input is assumed; green means confirmed stock or coverage.
  • Status also has labels or patterns; chart categories use the chart colours in order with direct labels, never status colours; contrast and keyboard focus pass.
  • Table and chart agree; units, shared-stock allocation and incoming receipts are explicit.
  • Filters, empty states and exports preserve scope and assumptions.
  • Printed output is inspected at its intended size.
  • Public guideline examples use fictional data; operational customer and stock records remain in their authorised report destination.